Our References

Source: Youtube – WHB Group

Állatorvostudományi Egyetem fűtés rekonstrukció – 2023

Veterinary University reconstruction of heating system – 2023

Execution design in 8.500m2, including architectural, structural, electircal BMS and acoustic as well.
The deisgn work contained the refurbishment of the boiler room, installation of heat pump system, the refurbhisment of secondary heating systems and installation of new central coolign plant. Design was performed in Revit.
Contact: Kiss Balázs (Veterinary University)
SZTE Jancsó Miklós Kollégium bővítés – 2023

SZTE Jancsó Miklós College extension – 2023

Mechanical design on 4,500m2. The dormitory building was expanded with 2 new parts: living and study rooms, service rooms. Our task was the planning of heating, cooling, water supply, sewage and ventilation, and the design of heating centrals.
Main supply is from the district heating.
BMW Üzemeltetési és Tűzoltósági épület BIM tervezése – 2023

BMW Facility Management and Fire Department BIM design – 2023

Mechanical design on 2200m2. The scope contained heating cooling, water systems, ventilation, compressed air, CO gas exhaust. As-built design contained BIM parametering, equipment identification coding and model aligning based on survey pointclouds.
BMW Üzemeltetési és Tűzoltósági épület BIM tervezése – 2023

BMW Facility Management and Fire Department as-built BIM design – 2023

Mechanical as-built design and modeling on 2.200m2 based on previous construction plan. The scope contained BIM parametering, equipment identification coding and model aligning based on survey pointclouds in IFC, RVT, DWG, DGN formats.
LG Toray Hungary gyárbővítés (CEB-2 projekt) – 2023

LG Toray Hungary factory extension (CEB-2 Project) – 2023

Complete HVAC, Plumbing and technology mechanical system design of alufoil factory extension. The scope contained combined cooling tower and chiller cooling system extension, compressed air system extension and design of water supply, drainage, comfort heating-cooling systems and ventilation (comfort, technology and heat&smoke) systems.
Lotte Aluminium II. ütem tervezése – 2023

Lotte Aluminium Phase 2 design – 2023

Process piping mechanical design of alufoil factory extension. The scope contained combined cooling tower and chiller cooling system extension, compressed air system extension, aluminium scrap piping design.
Krones, Karbonsemleges Energieellátás – 2023

Krones, Carbon-Neutral Energy Supply – 2023

Geothermal vertical closed-loop system will be established to supply energy to the existing mechanical system. As a result of the modernization, in addition to maintaining the interior comfort, the energy consumption and CO2 emissions of the factory will be reduced. Part of the planning task was the design of the geothermal heating center, the connection to the existing system, the utilization of compressor waste heat, and the design of a thermal fan cooling circuit within the plant.
BMW Üzemeltetési és Tűzoltósági épület tervezése – 2022

BMW Facility Management and Fire Department design – 2022

Mechanical design on 2.200m2. The scope contained heating cooling, supply and wastewater systems, ventilation, compressed air, CO gas exhaust. The project was created in BIM.
Bálna Budapest Felújítás – 2022

Bálna Budapest Refurbishment– 2022

During the project, fitout conversions were planned, and the mechanical system was also modernized due to existing operational difficulties. The scope of the project was the redesign of cooling-heating secondary, water supply-sewage, comfort ventilation systems and heating-cooling plant rooms.
Dunakeszi Művészetek Háza – 2022

Dunakeszi Art Centre & School – 2022

Comfort building engineering BIM-based design on 10,300 m2. The building consists of 3 parts: basement garage and service areas, Elementary Art school and Art center. Part of the task was the design of the cooling-heating system, water supply-sewage, comfort, CO exhaust and fire protection ventilation. The strict acoustic and interior design requirements of the concert hall had to be taken into account when designing the mechanical system.
Dunakeszi Bölcsöde – 2022

Dunakeszi Nursery – 2022

Comfort mechanical design on 600m2. The scope contained heating cooling, water supply, wastewater, ventilation and boiler gas supply design in the building extension. Also designed a boiler room.
Dunakeszi High School – 2020

Dunakeszi High School – 2020

Mechanical deisng on 20.000m2, 3D BIM.
Contact: Jávorka Noémi (Incorso Architect)
CEVA B1 3. labor tervezése

CEVA B1 3rd Lab design for vaccine production – 2020

Mechanical and process design on 800m2 (B/C and D clean rooms). The scope contained heating cooling, steam, sterile steam, WFI, soft water and compressed air system design.
Contact: Békés Ádám (Value4Real)

Állatorvostudományi Egyetem új Campus

Veterinary University – 2020

Mechanical and process design on 20.000m2, which contains 8.000m2 lab area. Total air flow is 383.000m3/h (clean room supply, exhaust, sterile supply). Additionally
• process gases
• RO and soft water
• process sewatge and
• steam design
Contact: Jávorka Noémi (Incorso Architect)

Private Palace Hyatt Hotel

Private Palace Hyatt Hotel

MEP design and design verificaiton for the heritage protected Hotel

ALLEE bevásárlóközpont felújítása

ALLEE Shopping Mall

Technical inspection and PM tasks for Shopping Mall refurbishment, including new food-court area.

CROWN - EO csarnok

CROWN – EO Hall

Complete HVAC design, design and permitting of compressor house and compressed air system in 2016.

Elringklinger gyártócsarnok

Elrinklinger Industrial Hall

Execution design, including process cooling and compressed air system in 2017.

SRF Fóliagyártó üzem

SRF Foil Factory

Mechanical and process desing on 30.000m2

Kreinbacher Pincészet

Kreinbacher Vinery

Design of air dehumidification system to prevent the Vinery from musting.

Telekom székház

Telecom Headquarter

Technical Inspection and PM on gross 88.000m2 building.

Dunaferr 30MW technológiai hűtés tervezése

Dunaferr 30MW process cooling

Estabilishment of a cooling center and heat distribution system for the reconstruction of the coil chamber gas purification system. The project was contracted as general design, including Environmental permitting and foundation works. During the task, 20MW cooling tower and 7MW absorbent cooler were designed and constructed, with a new pump house and a 200m long heat distribution line.

MOL kémény tervezés

MOL chimney installation

Design, permission and construction support of a central chimney for the 6,7MW output capacity Capstone micro gas turbines supplied by Regale Zrt, in 2016.

PM feladatok, épületauditok

Project Management Tasks and building audits

Duna Tower, East West Business Center, PremierOutlet Center, ParkCenters
Site survey, technical survey, short and long term CAPEX and OPEX estimation.

Coopervision labor

Coopervision lab

General design, including architecture, structure, MEP, sprinkler and fire alarm

NHK Rugógyár Tata

NHK Spring Factory Tata

Execution design of Phase 2 building on 20.000m2.

Bridgestone Manufacturing

Bridgestone Manufacturing

DDS offices, Locker rooms, FDS modeling, nitrogen heat-recovery and ventilation system design

Do you like our works?

Construction engineering design

Mrs. Éva Siket
+36-70-588-6008

Mr. Balázs Nyári
+36-20-480-9348

MEP Q Engineering Ltd.

Hungary, 1145 Budapest, Amerikai út 66.
Tax number: 12514658-2-42
Company registration number: 01-09-690178
Bank account number: 12011179-01480799-00100005